Author |
|
celafon Newbie

Joined: 15 April 2012 Location: Poland
Online Status: Offline Posts: 2
|
Posted: 15 April 2012 at 10:28am | IP Logged
|
|
|
A note for future.
Please add a check for php5-curl being installed. It took me while until I've realized this was the case the calendar was not working.
And BTW: thanks for the great product!
Cheers
Bart
|
Back to Top |
|
|
Igor AfterLogic Support

Joined: 24 June 2008 Location: United States
Online Status: Offline Posts: 6122
|
Posted: 17 April 2012 at 12:37am | IP Logged
|
|
|
I believe the developers have already added this check, it will be there with the next update. Thank you!
--
Regards,
Igor, AfterLogic Support
|
Back to Top |
|
|